Our Reference

.
Client: PIRECO / l'Année de Projet: 2017

Redevelopment and modernization of the SNDP fuel depot located in the Rades oilfield (pipes and supports)

Client: SNDP AGIL / l'Année de Projet: 2017

Supply, manufacture and transport of 500 displays for 6 and 13 kg gas bottles

Client: CPG / l'Année de Projet: 2016

Supply and manufacture of a tank for feeding seclars JO 5113 in laundry 3 of M'dhilla

Client: CPG / l'Année de Projet: 2015

Renovation work structures storage hall wet phosphate with roofing and replacement structures siding long 160 m

Client: ALKIMIA PACKAGING / l'Année de Projet: 2015

Tank truck loading facility for bulk delivery from ALKIMIA (structures, silos and piping).

Client: ENMA & GAZ / l'Année de Projet: 2013

INSTALLATION OF CARTIDGE FILTER FOR 32" GAS PIPELINE AT MELLITAH COMPLEX

Client: EMCO / l'Année de Projet: 2013

Supply, manufacture and installation of racks racks and pipes for construction Mellitah

Client: AFRICA BITUME / l'Année de Projet: 2013

A storage facility and manufacturing bitumen industrial zone of Gabes Construction

Client: Bouchamaoui Industries / l'Année de Projet: 2013

Prefabrication work of metal structures of support structures of power spheres SNDP pipes

Client: Bouchamaoui Industries / l'Année de Projet: 2013

Prefabrication work feeding pipes spheres SNDP GABES

Client: G. C. T Usine de Gabès / l'Année de Projet: 2012

Supply, prefabrication and replacing a tank molten sulfur to the phosphoric acid plant

Client: G. C. T Usine de Gabès / l'Année de Projet: 2012

Roof repair and replacement of various nozzles for the ammonia storage tank to the DAP plant

Client: Bouchamaoui Industries / l'Année de Projet: 2012

Prefabricated skid with two manifolds for ENI

Client: SEPT / l'Année de Projet: 2011

Replacing pipes and valves 12 "and 14" in storage depot Skhira

Client: SALAKTA FERTILIZER / l'Année de Projet: 2011

Others need to work making plant

Client: G. C. T Usine de Gabès / l'Année de Projet: 2011

Replacement decking and railing for acid storage tanks of the second production line at the phosphoric acid plant

Client: G2I / l'Année de Projet: 2011

Prefabrication, sandblasting and painting of metal structures in a batch for a set of warehouses

Client: G. C. T Usine de Gabès / l'Année de Projet: 2011

Prefabrication and replacement wiper arm agitators storage tanks at the DAP plant

Client: G. C. T Usine de Gabès / l'Année de Projet: 2011

Supply and installation of a shelter metal frame for post gas utilities 1 and 2 of the phosphoric acid plant expansion

Client: SOCIÉTÉ DES CIMENTS DE GABES / l'Année de Projet: 2011

Supply and replacement gas pipes between portico and main line for line 1 and line 2

Client: G. C. T Usine de Gabès / l'Année de Projet: 2011

Replacement bottom bulging DN 4500 box before the sulfur burner to the phosphoric acid plant

Client: L’USINE DE TIFERT A SKHIRA / l'Année de Projet: 2010-2011

PRECAST & PIPING ASSEMBLY METAL FACTORY SKHIRA

Client: L’USINE DE TIFERT A SKHIRA / l'Année de Projet: 2010

PREFABRICATION & METAL DUCT ASSEMBLY DN 800

Client: G. C. T Usine de Gabès / l'Année de Projet: 2010

Supply and installation of a steel frame covered shelter for the installation of gas compression

Client: G. C. T Usine de Gabès / l'Année de Projet: 2009

Making agitator blades in stainless steel

Client: GEA-TECHNOFRIGO / l'Année de Projet: 2008

Various studies of prefabrication and installation of piping system with fire support components to STEG GPL Gabes.

Client: STEG GPL / l'Année de Projet: 2008

Siting and welding gas pipe 10 "On site El Borma.

Client: G. C. T Usine de Gabès / l'Année de Projet: 2008

Industrial water piping DN 300.

Client: BOUCHAMAOUI / l'Année de Projet: 2008

Confction Jaquette APEX

Client: GEA-TECHNOFRIGO / l'Année de Projet: 2007

Various pipes and fittings on site LPG - Gabes.

Client: CIMENTERIE DE GABES / l'Année de Projet: 2007

Supply and installation of a network of compressed air separators.

Client: NAFCO / l'Année de Projet: 2007

Prefabrication and installation of stainless steel piping.

Client: CERI / l'Année de Projet: 2007

Siting and weld pipes on-site El Haouaria.

Client: BOUCHAMAOUI INDUSTRIE / l'Année de Projet: 2007

Welding on line 10 "Oum Echyeh / Gabes.

Client: CERI / l'Année de Projet: 2007

Various studies of compressed air piping construction Métlaoui GIC

Client: CIMENTERIE DE GABES / l'Année de Projet: 2007

alternative feeding compressed air system furnace.

Client: STEG GPL / l'Année de Projet: 2007

Welding on gas pipe 8 "; el borma on site

Client: AL KIMIA Gabès / l'Année de Projet: 2007

Redevelopment of an installation of boilers and a set of pipes DN 100 and DN 150 in stainless steel.

Client: TECI / l'Année de Projet: 2006

Supply and installation of piping for batteries of cyclones.

Client: EMGTPH / l'Année de Projet: 2006

Prefabrication and assembling various steel pipes DN 400, DN 250, DN 80.

Client: AL KIMIA Gabès / l'Année de Projet: 2006

Installation of a boiler and installation of air service and air.

Client: G. C. T Usine de Gabès / l'Année de Projet: 2006

Provision prefabrication and assembly of a double line envelope DN 100 /DN 250

Client: CERI / l'Année de Projet: 2006

Works of prefabrication and erection of piping and other equipment on site LPG

Client: SBF / l'Année de Projet: 2006

Various studies of prefabrication and installation of piping and equipment for wastewater treatment plant Zarat.

Client: G. C. T Usine de Gabès / l'Année de Projet: 2005

flushing pipe replacement chiller chemetics

Client: G. C. T Usine de Gabès / l'Année de Projet: 2005

Replacement of water pipe lines between industrial workshops DCP.

Client: AL KIMIA Gabès / l'Année de Projet: 2005

Pipes and tubes for feeding unit staining granular STPP.

Client: AL KIMIA Gabès / l'Année de Projet: 2005

Supply and installation of a fire water system.

Client: PAM / l'Année de Projet: 2005

Replacing various equipment and piping in the center GP2 SNDP.

Client: CIMENTERIE de Gabès / l'Année de Projet: 2005

Supply and installation of a compressed air system

Client: NAFCO / l'Année de Projet: 2005

Prefabrication and installation of stainless steel pipes for sewage plant Mateur.

Client: SNDP / l'Année de Projet: 2005

Replacing a section of fire line.

Client: NAFCO / l'Année de Projet: 2005

Prefabricated structures concentrates SOTRAPIL Rades and Carthage.

Client: NAFCO / l'Année de Projet: 2005

Prefabrication and radio control various piping.

Client: MERI / l'Année de Projet: 2005

Installation of piping oil STLR.

Client: MERI / l'Année de Projet: 2004

Development corridor C2 and C3 deposition at Shell and fire water pump station transfer

Client: MERI / l'Année de Projet: 2004

Water transfer pumping stations Shell depot fire

Client: MERI / l'Année de Projet: 2004

LPG pipe mounting air and water for fire station load Gabes

Client: SBF / l'Année de Projet: 2004

Various studies of prefabrication and installation of piping and equipment for wastewater treatment plant at El Hamma

Client: G. C. T Usine de Gabès / l'Année de Projet: 2004

Replacement pipe network around the fire hall DAP A

Client: NAFCO / l'Année de Projet: 2004

Installation of a gas compression facility in Gabes STEG

Client: NAFCO / l'Année de Projet: 2004

Interconnexion of two terminals from Exxon Mobil.

Client: CIMENTERIE DE GABES / l'Année de Projet: 2004

Installing a gas station expansion.

Client: CIMENTERIE DE GABES / l'Année de Projet: 2004

Compressed air network installation for ciment silos filters

Client: ALKIMIA / l'Année de Projet: 2004

Install steel pipe DN 100 to DN 150.

Client: ALKIMIA / l'Année de Projet: 2004

Installing pump unit with high-pressure piping.